Established in 1997 as a used equipment services company our business has continually evolved and is now primarily focused on delivering complete used/surplus power plant solutions on an EP or EPC (Engineering, Procurement and Construction) basis. We have developed a particular niche in used/surplus new Biomass/WTE power plants. By utilising used/surplus equipment, we are uniquely positioned to provide a complete package solution, whilst simultaneously offering a HUGE CAPEX saving VS a traditional ‘new’ plant EPC.

1 x 7MW Kawasaki M7A-03D DLE Gas Turbine-Generator Package (USED) 50Hz
1 x 7MW Kawasaki M7A-03D DLE Gas Turbine-Generator Package Year: 2010 Condition: Used Hours of...
1 x 15MW Condensing Steam Turbine-Generator Package (NEW)
1 x 15MW Condensing Steam Turbine-Generator Package Condition - NEW (Manufactured to order) Out...
1 x 10MW Triveni Condensing Steam Turbine-Generator Package (NEW)
1 x 10MW Condensing Steam Turbine-Generator Package Condition - NEW (Manufactured to order) Out...
1 x 40MW Condensing Steam Turbine-Generator Package (NEW)
1 x 40MW Condensing Steam Turbine-Generator Package Condition - NEW (Manufactured to order) Out...
1 x 56,250 KVA Alternator (New)
1 x Unused (NEW) Alternator (Manufactured to order) 4 Pole Please inquire for additional informat...
16MW CoGeneration Power Plant (USED) 50Hz
16MW CoGeneration Power Plant Condition: Used Hours of Operation: ~40,000 (post zero hour overh...
1 x 22.5t/hr HRSG for Solar Titan 130 Gas Turbine (UNUSED)
1 x 22.5t/hr Heat Recovery Steam Generator Unused. Installed but never operated. Year of Manufa...
1 x 5.2MW Solar T60 Gas Turbine-Generator Package (USED) 50Hz
1 x 5.2MW Solar T60 Gas Turbine-Generator Package Status: In Storage (Photos are prior to disman...
2 x 5.5 MW Solar T60 Gas Turbine-Generator Packages (USED) 50Hz
*Note: These T60s are sold. The listing is being kept live as an example of what we can supply 2...
1 x 5.67MW Solar T60 Gas Turbine-Generator Package (USED) 50Hz
1 x 5.5MW Solar T60 Gas Turbine-Generator Package Year: 2018 Condition: Used Hours of operatio...
1 x 470KW Back Pressure Steam Turbine Package (NEW)
1 x 470KW Back Pressure Steam Turbine Condition: Unused Year of Manufacture: 2014 Application:...
102MW HFO Fuelled Power Plant (USED) 50Hz
102MW HFO Fuelled Power Plant Condition: Used Hours of Operation: ~90,000 Based on 14 x 7.6MW ...