1 x 5.4MW Siemens SGT-A05 Gas Turbine-Generator Package (USED) 50Hz
1 x 5.4MW Siemens SGT-A05 Gas Turbine-Generator Package Year: 2007 Condition: Used Hours of op...
2.7MW Biomass Fuelled Power Plant (USED) 50Hz
2.7MW Biomass Fuelled Power Plant Condition: Used, still operating Hours of Operation: ~125,000...
1 x Rolls-Royce Allison – 501KH (Siemens SGT-A05) Gas Turbine Core Engine (Refurbished)
1 x Rolls-Royce Allison – 501KH (Siemens SGT-A05) Gas Turbine Core Engine Only. Condition: Refur...
1 x 24.5MW Condensing Steam Turbine-Generator Package (UNUSED) 50Hz
UEN 3430 1 x 24.5MW Condensing Steam Turbine-Generator Package Condition: Unused Make: Siemens...